青青伊人,久久久噜噜噜久久中文字幕色伊伊,中文字幕久久精品无码,日本老熟妇毛茸茸

您好,歡迎來(lái)到濟(jì)南通宇恒成自動(dòng)化工程有限公司網(wǎng)站!

服務(wù)熱線

常見問(wèn)題
新聞中心

電氣成套設(shè)備常見問(wèn)題

發(fā)布時(shí)間:2021-12-30 來(lái)源:http://jietitong.cn/ 瀏覽量:

1、驅(qū)動(dòng)裝置的信號(hào)線懸空,未做固定處理,亦未做屏蔽接地處理。
1. The signal line of the driving device is suspended without fixing or shielding grounding.
2、 驅(qū)動(dòng)裝置布置安裝不合理,應(yīng)與進(jìn)線濾波器電抗器一起單獨(dú)組柜,不宜采用面板式安裝,而應(yīng)采用框架方式安裝。
2. The layout and installation of the driving device is unreasonable, so it should be combined with the incoming filter reactor separately. The panel installation should not be adopted, but the frame installation should be adopted.
3、大型驅(qū)動(dòng)裝置電機(jī)電纜一般不應(yīng)該再經(jīng)過(guò)端子過(guò)渡,而應(yīng)直接出線。
3. Generally, the cable from large driving device to motor shall not pass through the terminal transition, but shall be led out directly.
4、電機(jī)電纜應(yīng)使用屏蔽電纜,屏蔽層應(yīng)抱箍。
4. Shielded cables shall be used for motor cables, and the shielding layer shall be hooped.
5、系統(tǒng)進(jìn)線布置設(shè)計(jì)不合理,阻擋驅(qū)動(dòng)裝置冷卻風(fēng)道。
電氣成套
5. The system incoming line layout design is unreasonable, blocking the cooling air duct of the driving device.
6、主進(jìn)線不宜使用端子,應(yīng)采取銅排結(jié)構(gòu)件壓接電纜方式。
6. The terminal should not be used for the main incoming line, and the copper bar structure should be used to crimp the cable.
電氣成套設(shè)備常見問(wèn)題分析,對(duì)比看看你中招了嗎?
Analysis and comparison of common problems of complete electrical equipment. Have you been recruited?
1、DP總線未正確的固定與屏蔽,CU320模塊的用于固定與屏蔽電纜線的附件缺失。
1. DP bus is not fixed and shielded correctly, and accessories for fixing and shielding cable of cu320 module are missing.
2、編碼器線,裝置通訊線隨意懸空,未作固定,編碼器線亦未作屏蔽。
2. The encoder line and device communication line are suspended at will, not fixed, and the encoder line is not shielded.
3、CU320控制單元及接口模塊均未做接地處理。
3. Cu320 control unit and interface module are not grounded.
4、傳動(dòng)裝置未安裝屏蔽附件,安裝位置偏低,且被線槽阻擋,導(dǎo)致冷卻風(fēng)道被阻擋,裝置進(jìn)出線不合理。
4. The transmission device is not equipped with shielding accessories, the installation position is low and blocked by the trunking, resulting in the blocking of the cooling air duct and the unreasonable inlet and outlet lines of the device.
5、柜體進(jìn)線位置設(shè)計(jì)不合理。
5. The design of cabinet incoming line position is unreasonable.
首頁(yè)首頁(yè) 產(chǎn)品產(chǎn)品 電話電話 置頂置頂
国产精品视频123区| 人妻大香蕉| 欧美日韩激情不卡| 色欲少妇八AV| 成人无码免费视频| 亚洲欧美日韩人成综合| 中文字幕Av日韩精品一区二区| 日韩电影不卡视频| 色悠悠在线免费观看| 欧州熟妇色xxxxx| 在线无码国产精品| 欧美1区| 交换人妻一区二区| 无码午夜福利免费区久久| 手机麻豆新映画av网| 中文字幕激情综合| 无码群交| 无码一区二区三区四| 国产真实乱| 欧洲毛片免费看| 999在线视频| 噜噜影院高潮| 激情五月亚洲综合| 欧美色图,色图吧| 日韩东京热久久激情| 色综合.com| 亚洲熟女福利| 五月婷婷综合亚洲| 亚洲欧美| 人妻降临无码| av资源网站| 天堂√最新版中文在线天堂 | 国产精品 视频一区 二区三区| 精品一区在线观看视频| 巨人精品福利官方导航| 亚洲无码熟人妻| 欧美爱在线| 狠狠地操,狠狠地日| 91AV精品视频| 九九精品性XXXX| 国产一区一区|